GENERAL SPECIFICATION FOR THE PROPOSED CONSTRUCTION OF THE BUILDING, IN AND AROUND BANGALORE
BASIC COST 1450/ SFT, EXCLUDING GST.
- All super structure work on based of framed structure.
- All walls external and internal CC Block work 6”and 4”. li>
- Construction work must be done as per architectural drawings.
- All RCC specification is M-20 concrete.
- Any 53 cement for concrete and for walls and plastering43 grade M. Sand will be used.
- Cement brand as per market availability ( clients choice).
- Bathroom wall tiles up to 7ft hight, Commodes Wall mounted and all standard fittings like tap, kitchen tap, wall mixture.
- Excavation and Anti-termite treatment.
(B) SUPER STRUCTRE
6” and 4” CC Block work 6”and 4”. CM 1:6 height of the wall up to ceiling/beam bottom. Plastering in CM 1:4 for walls and ceiling with lime rendering and external walls are rough (sponge) finish.
Through lintel, Chejja and loft, RCC roof will be provided as per the drawing.
Parapet wall will be up 3’3” high with 6” thick.
Main door make of teak wood with size will be as follows. For main door 6”x 4” frame with 1½”thick teak shutter (3’6”x7’0”) Internal door frames are Sal wood frames (5”x3”) and Flush (maxon) shutters for owner.
Main door Europa Lock 1no, 1 handle, 2 tower bolts brass, door stopper 1no. For internal door Mortise lock powder coated 1 no, powder coated tower bolt 2no’s, door stopper, Toilet doors and frames will be Flush Door. UPVC windows with safty grill
For Pooja room Door made of teak wood with thickness 1.25” and basic design.Any additional carving required will be at owners cost. Flooring will be used for the full house inside is granite basic cost is 80=00/Sft Car porch flooring tiles with basic cost 40/sqft.
For toilets walls, ceramic tiles are used, basic cost of 60=00/Sft and up to 7’ high. For kitchen dado area from the platform to 4’0” high, Kajaria Brand Dimension 24”X18”-1 no (one in kitchen) CARYSIL SINK (basic cost 7300/each). Counter top will be provided with granite 30-35mm thick Black/Hasan Green color as per Diagram. Kitchen Tap two independent Tap (Basic cost 1200 each.) Granite slab basic cost 200/Sft
All sanitary pipes swr PVC 4kg/m and 6kg/m and plumbing pipes are used CPVC ashirvad brand are used. 1.25” pipe line should be providing for the EWC floor mount only (White) and BWSSB (Cauvery) water line only for Ground floor.Solar line provision
All fittings are used with JAGUAR standard fittings finish and wash basin and commodes are matching with tiles
Wall mount commode of the brand Paryware/Hindware basic coast 4500/ each will be used, wash basin basic cost 1000/each. All Bath room wall Mixture basic coast 3500/ each and Kitchen tap basic cost 1200/each.
All electrical wires are used ISI (finolex or equivalent) branded and Anchor Roma modular switches will be used. UPS line provision for full house only lightings.
All wood will be finished with paint, Windows shutter with plain glass 3.5mm.
All electrical and plan sanctioning, and other office deposit’s, meter board Wiring, cable laying, main building and grounding, outside water connection, temporary electrical power connection charges shall be borne by building owner. Water and electrical should be supplied by the owner.
Duration of the construction (----) months from the day contract is signed.
Telephone and all electrical points as per drawings or actual with modular switch anchor roma brand.
Providing and fixing the overhead water tank Ganga Kaveri Triple layer.
Ceiling same as Internal Walls will be finished with 1coat of primer and 2coats of putty and 2coats of interior Primier emulsion paint as per the Architects/Engineers design and Shade. Asian Make.
External Walls will be finished with one coat of primar along with 2coats of weather proof APEX paint as per Architects/Engineers approved color and make.
WPC with 10mm down size jelly and necessary waterproof liquid and cement and cement plastering for require slope as directed by the Architects/Engineers according to the site condition.
All internal & External staircase railings and balcony railings will be of Mild Steel.
Reinforcement Steel Sunvik / Indus ( As per structural design and detail)
Gate, Compound wall as per drawings.
(C) ADDITIONAL WORK AT EXTRA COST ON ACTUALS
Safety Grill Work 250/sft
Front Door Safety 300/sft
Solar connection and accessories
Stone cladding work.
Soak pit and 2nd line for the Soak pit line will be cost extra.